Sunday, April 22, 2007
First Day
Today the shop is on! Charlie is making "clown cups" with our assistant Dave, and I've been taking pictures to post to the blog, popping open the cupola, tweaking fans, doors and windows to experiment with draft. Glenn is installing solar fans in the showroom. All in all things are going very smoothly.
Thanks to a lighting designer Charlie will be back into serious production tomorrow. I'll be getting to some slinky orders, and making some to silver as well. It's very exciting to be at this place. The space feels great, and the view of the river from the shop can't be beat.
Subscribe to:
Post Comments (Atom)
2 comments:
Well I've missed most of the construction project! However, It's beutiful, Congratulations!
At the beginning I would have said "Enjoy the process of setting it up (you only get to do it once)." Which I'll say now cause you still have more work to do. It can sometimes get difficult but that's a small issues compared to building your dream!
I tired hard to have Delta's do the same during her Salon build, but she was too caught up in the issues to enjoying the process.
Good Luck You Two!
Those look like some fun stairs. Someone send charlie a slinky.
Post a Comment